? |
Last_Name |
Affilliation |
Title
|
C9-1 |
Alekseev P.N. |
ITEP |
Functional control of the ITEP-TWAC Facility equipment |
C9-2 |
Arutunian S.G. |
Yerevan Physics Institute |
Heat coupling in multi-wire vibrating wire monitor |
C9-3 |
Bekhtenev E.A. |
BINP |
Beam Position measurement system for VEPP2000 collider |
C9-4 |
Boriskin V.N. |
NSC KIPT |
Power Supply Control System for the Linac of the "NESTOR" Storage Ring. |
C9-5 |
Kaportsev E.V. |
RRC "Kurchatov Institute" |
The Program Tools for KSRS Operation |
C9-6 |
Kovalishin A.S. |
Troitsk |
Systems quality improvement of DTL frequency control on accelerator INR RAS |
C9-7 |
Moseiko N.I. |
RRC "Kurchatov Institute" |
Intellectual crate-controller K166 |
C9-8 |
Reinhardt-Nickoulin P.I. |
INR RAS |
Modernization of BCT for INR linac |
C9-9 |
Reinhardt-Nickoulin P.I. |
INR RAS |
Ion monitor of transverse beam parameters for INR proton linac |
C9-10 |
Shendrik V |
NSC KIPT |
The system to control the electron beam current and position at the accelerator LUE-60M-injector of the “NESTOR” facility |
C9-11 |
Shvedunov V.I. |
Skobeltsyn Institute of Nuclear Physics Lomonosov MSU |
Beam parameters measurement of technological 10 MeV linac |
C9-12 |
Voevodin V.P. |
IHEP |
Information technologies in the IHEP U-70 accelerator complex control system |
C9-13 |
Vorontsov V.A. |
|
Optimization of the accelerator parameters by the interactive method |
C9-14 |
Berkaev D.E. |
BINP |
Control System for Injection Channels of VEPP-2000 Collider |
C9-15 |
Berkaev D.E. |
BINP |
Beam Measurement System of VEPP-2000 Injection Channels |
C9-16 |
Sukhikh L.G. |
Tomsk Polytechnic University |
Transition and Smith-Purcell Pre-Wave Zone Radiation Density Amplification Using Paraboloidal Targets for Beam Diagnostic Purposes |
C9-17 |
Rogovsky Yu. |
BINP |
Calibration of the Beam Position Monitors for VEPP-2000 |